Data and facts
- Project name:
- Zimmerberg rescue shafts, Schweiz
- Client:
- SBB AG
- Contract value:
- 7.27 million EUR (as part of a consortium)
- Construction period:
- 2002 - 2003
- Consortium:
- Züblin Schlittler Spaltenstein - JÄGER
As member of a consortium, JÄGER built three turnkey emergency exit shafts for the Zimmerberg Base Tunnel, between Zürich and Thalwil. The Lätten, Kilchberg and Brunau shafts are 61 m, 72 m and 34 m deep, respectively. The Lätten and Kilchberg shafts were excavated using the drill and blast method and excavators. The Brunau shaft could only be sunk using excavators because of the prevailing poor geology. All three emergency exit shafts are equipped with air lock and shelter ventilation, fire extinguisher piping and self-propelled shaft elevators.
Contact
Downloads
You can find all the project data and facts here:
Brunau shaft
Kilchberg shaft
Lätten shaft









