Project name:
Zimmerberg rescue shafts, Schweiz
Client:
SBB AG
Contract value:
7.27 million EUR (as part of a consortium)
Construction period:
2002 - 2003
Consortium:
Züblin Schlittler Spaltenstein - JÄGER

Zimmerberg rescue shafts

As member of a consortium, JÄGER built three turnkey emergency exit shafts for the Zimmerberg Base Tunnel, between Zürich and Thalwil. The Lätten, Kilchberg and Brunau shafts are 61 m, 72 m and 34 m deep, respectively. The Lätten and Kilchberg shafts were excavated using the drill and blast method and excavators. The Brunau shaft could only be sunk using excavators because of the prevailing poor geology. All three emergency exit shafts are equipped with air lock and shelter ventilation, fire extinguisher piping and self-propelled shaft elevators.

Contact

Thomas LÄNGLE
Jäger Bau GmbH
Batloggstraße 95
6780 Schruns
Österreich
T: +43 5556 7181-822
Contactform

Downloads

You can find all the project data and facts here:
Brunau shaft
Kilchberg shaft
Lätten shaft