Data and facts
- Project name:
- Samina pumped storage scheme, Liechtenstein
- Client:
- Liechtensteinische Kraftwerke
- Contract value:
- 5.9 million EUR (as a part of a consortium)
- Construction period:
- 2011 - 2013
- Consortium:
- Meisterbau - JÄGER - Hilti
Jäger Bau GmbH has been awarded with the construction of a storage cavern for the existing hydro power plant "Samina" in the city of Vaduz (Principality of Liechtenstein) in 2009. This small power station will be converted to a pumped storage hydro power plant. The start of construction has been delayed remarkably due to extensive environmental compatibility assessments resulting in a commencement of the site installation in October 2011 only.
The excavation of the storage cavern (50.000 m³) has been done by drill & blast method. The adit is right next to the existing head race tunnel requiring utmost caution during the initial blasts. Further special attention had to been taken to a preferably low noise level execution since the site is located within a residential area.
Contact

Jäger Bau GmbH
Batloggstraße 95
6780 Schruns
Österreich
T: +43 5556 7181-827
Contactform
Downloads
More project data and facts here:
Samina pumped storage scheme