Fussach water supply system, BA 11 - Mahd

Civil Engineering Municipal water engineering

Key data

Country
Austria
Client
municipality Fußach
Contract value
0.25 Mio EUR
Construction time
July 2013 - October 2013
Contact

Sekretariat Tiefbau
+43 5 7181-1690
E-Mail


In the municipality of Fussach, the water supply system and the existing supply pipelines in Mahd were replaced. Replacement of the water pipelines took place in parallel with the gas pipeline of the VEG.

back to overview